02 / 05 — Service T — Transmission & Power
Power Networks & Electrical Supply
From the incoming supply to the last socket: cable networks, distribution boards and protection — installed to the design and tested before energising.
Scope of work
- 2.1 HV / MV / LV cable network installation HV / MV / LV
- 2.2 Cable routing systems, trays and trunking Trays · Trunking
- 2.3 Main and sub-main distribution boards (MDB / SMDB) and ATS MDB · SMDB · ATS
- 2.4 Indoor and outdoor lighting, sockets and industrial switches Lighting · Sockets
- 2.5 Earthing loops and active / passive lightning protection Earthing · LPS
- 2.6 Backup power integration — UPS and generators UPS · Genset